<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Anderson Green</title>
	<atom:link href="http://andersongreen.co.uk/feed/" rel="self" type="application/rss+xml" />
	<link>http://andersongreen.co.uk</link>
	<description>building services consultants</description>
	<lastBuildDate>Wed, 08 Feb 2012 10:35:12 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	
		<item>
		<title>Pier Road Gillingham</title>
		<link>http://andersongreen.co.uk/articles/735/pier-road-gillingham-2/</link>
		<comments>http://andersongreen.co.uk/articles/735/pier-road-gillingham-2/#comments</comments>
		<pubDate>Wed, 08 Feb 2012 10:35:12 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Accommodation]]></category>
		<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=735</guid>
		<description><![CDATA[Details Value: £1.5m Client: University of Kent Synopsis The project involved the building of 2no accommodation blocks providing 400 standard and 6no disabled new study bedrooms. Each block was based around a number of individual study bedrooms with a communal &#8230; <a href="http://andersongreen.co.uk/articles/735/pier-road-gillingham-2/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£1.5m</p>
<p><strong>Client: </strong>University of Kent</p>
<h3>Synopsis</h3>
<p>The project involved the building of 2no accommodation blocks providing 400 standard and 6no disabled new study bedrooms. Each block was based around a number of individual study bedrooms with a communal lounge and kitchen area.</p>
<p>Anderson Green provided detailed design and build cost proposals for all internal and external M&amp;E services; detailed costs to guarantee cost certainty; design &amp; build and coordination of the mechanical and electrical systems.</p>
<p><a href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/Pier-Road.pdf">Download PDF Version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Nottingham Forest Football Club</title>
		<link>http://andersongreen.co.uk/articles/720/nottingham-forest-football-club/</link>
		<comments>http://andersongreen.co.uk/articles/720/nottingham-forest-football-club/#comments</comments>
		<pubDate>Tue, 07 Feb 2012 16:45:58 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Leisure]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=720</guid>
		<description><![CDATA[Details Value: £330,00.00 (building services) Client: Nottingham Forest Football Club Synopsis A new two storey training facility that consists of, to the ground floor players dinning/lounge served by a full kitchen, media/conference room and changing facilities with showers, hydro treatment &#8230; <a href="http://andersongreen.co.uk/articles/720/nottingham-forest-football-club/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£330,00.00<br />
(building services)</p>
<p><strong>Client: </strong>Nottingham Forest<br />
Football Club</p>
<h3>Synopsis</h3>
<p>A new two storey training facility that consists of, to the ground floor players dinning/lounge served by a full kitchen, media/conference room and changing facilities with showers, hydro treatment and ice baths.</p>
<p>At the first floor there’s a cardio gymnasium with exercise equipment and a free weights area, physiotherapy treatment rooms and ancillary office accommodation.</p>
<p>The new training facility was constructed on existing Nottingham Forest Training Ground without impacting on the operation or use of the overall facility.</p>
<h3>Best in Class</h3>
<p>Providing the modern training and treatment facility the new building contained a media room complete with Audio Visual equipment which can be utilised by both media and  Club for player training /coaching purposes.</p>
<p>To maximise the energy saving offered by daylight the lighting in the social spaces are controlled by automatic daylight sensors. The changing and showers where windows are limited high efficient lighting fitting are utilised.</p>
<p>Heat recovery ventilation units are installed throughout and the scheme also included a rain water harvesting system.</p>
<p><a title="Nottingham Forest Football Club PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/NFFC.pdf">Download PDF Version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Goals Soccer Centres</title>
		<link>http://andersongreen.co.uk/articles/715/goals-soccer-centres/</link>
		<comments>http://andersongreen.co.uk/articles/715/goals-soccer-centres/#comments</comments>
		<pubDate>Tue, 07 Feb 2012 16:36:15 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Leisure]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=715</guid>
		<description><![CDATA[Details Value: £1-1.5m build (ex pitch installation) Client: Goals Synopsis Consisting of 12No illuminated 5-A-Side artificial football pitches served by a sports social facility consisting of changing/shower rooms, bar-lounge and kitchen, Goals Soccer Centres offer the latest in sport recreation &#8230; <a href="http://andersongreen.co.uk/articles/715/goals-soccer-centres/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£1-1.5m build<br />
(ex pitch installation)</p>
<p><strong>Client: </strong>Goals</p>
<h3>Synopsis</h3>
<p>Consisting of 12No illuminated 5-A-Side artificial football pitches served by a sports social facility consisting of changing/shower rooms, bar-lounge and kitchen, Goals Soccer Centres offer the latest in sport recreation with 42 facilitates in the UK.</p>
<p>Anderson Green have designed the building services for many  of the facilities and have become Gaols Soccer Centres preferred BREEAM assessor.</p>
<h3>Best in Class</h3>
<p>To reduce the energy demand and carbon emissions of the previous design, LED lighting and more efficient heat recovery systems were introduced to the building services designs.</p>
<p>The overall environmental impact of the developments are assess via the BREEAM methodology with BREEAM Bespoke “Very Good” ratings being achieved.</p>
<p><a title="Goals Soccer Centres PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/Goals-Soccer.pdf">Download PDF Version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Edgbaston Mill</title>
		<link>http://andersongreen.co.uk/articles/709/edgbaston-mill/</link>
		<comments>http://andersongreen.co.uk/articles/709/edgbaston-mill/#comments</comments>
		<pubDate>Tue, 07 Feb 2012 16:24:16 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Hotels]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=709</guid>
		<description><![CDATA[Details Value: £10m Build Client: Edgbaston Property Holdings Ltd Synopsis Edgbaston Mill is a 200 bedroom Double Tree by Hilton hotel with adjacent three storey 3000m² health centre and spa and 180m² retail unit, all of which enjoys a prominent &#8230; <a href="http://andersongreen.co.uk/articles/709/edgbaston-mill/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£10m Build</p>
<p><strong>Client: </strong>Edgbaston Property<br />
Holdings Ltd</p>
<h3>Synopsis</h3>
<p>Edgbaston Mill is a 200 bedroom Double Tree by Hilton hotel with adjacent three storey 3000m² health centre and spa and 180m² retail unit, all of which enjoys a prominent and highly visible location on the prestigious Calthorpe Estate, Edgbaston.</p>
<p>The building comprises of lower ground, ground floor and six storeys above ground.</p>
<p>The Hotel’s lower ground floor area will be utilised for car parking and plant areas, and the ground floor will contain three separately themed restaurants.</p>
<p>The first floor includes a 200 person function room, with the accommodation spread over the second to sixth floors of the building.</p>
<h3>Best in Class</h3>
<p>Reducing the typical high energy demand associated with hotels was a major consideration for the design of the building services.</p>
<p>The hotel lighting scheme predominately utilises LED luminaires closely controlled by a combination of  time clock, daylight, proximity card and presence detection.  High efficient air source heat pumps provide the bedrooms heating and cooling and the hot water is generated via a CHP unit which also serves the electrical services.</p>
<p><a title="Edgbaston PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/Edgbaston.pdf">Download PDF Version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Newman University College</title>
		<link>http://andersongreen.co.uk/articles/703/newman-university-college/</link>
		<comments>http://andersongreen.co.uk/articles/703/newman-university-college/#comments</comments>
		<pubDate>Tue, 07 Feb 2012 16:12:43 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Education]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=703</guid>
		<description><![CDATA[Details Value: £2.3m (M&#38;E) Client: Morgan Sindall Synopsis The new 3 story entrance building ‘state of the art’ Library, atrium, office along with a newly refurbished Arts and Science block. Anderson Green  were responsible for the Mechanical and Electrical Design, &#8230; <a href="http://andersongreen.co.uk/articles/703/newman-university-college/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£2.3m (M&amp;E)</p>
<p><strong>Client: </strong>Morgan Sindall</p>
<h3>Synopsis</h3>
<p>The new 3 story entrance building ‘state of the art’ Library, atrium, office along with a newly refurbished Arts and Science block.</p>
<p>Anderson Green  were responsible for the Mechanical and Electrical Design, producing the Part L compliance calculations, thermal model and level 5 energy performance  certification.</p>
<p>The new Library centre utilises natural ventilation system interfaced with window master controller.</p>
<p>On completion of the mechanical &amp; electrical design Anderson Green undertook the spatial co-ordination to ensure the disciplines were installed with the minimum of problems.</p>
<h3>Best in Class</h3>
<p>Principal and Chief Executive Peter Lutzeier comments</p>
<p>“This significant investment will enable the continuation of the good work we are doing whilst ensuring we offer attractive and modern surroundings where students can realise their academic potential, and remain a positive presence in the local community.”</p>
<p>The construction programme will continue in a series of phases over the next two years, and the project is part of Newman’s overall commitment to integrating into the local community in Bartley Green whilst providing excellent facilities for students.</p>
<p><a title="Newman College PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/Newman-College.pdf">Download PDF Version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>University of Nottingham Energy Technology Building (ETB)</title>
		<link>http://andersongreen.co.uk/articles/697/university-nottingham-energy-technology-building-etb/</link>
		<comments>http://andersongreen.co.uk/articles/697/university-nottingham-energy-technology-building-etb/#comments</comments>
		<pubDate>Tue, 07 Feb 2012 15:45:08 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Education]]></category>

		<guid isPermaLink="false">http://andersongreen.co.uk/?p=697</guid>
		<description><![CDATA[Details Value: £6.5m Client: University of Nottingham Synopsis The Energy Technologies Building is a £6.5m research centre which will bring together world-class experts in energy research at The University of Nottingham. The 2500 m² facility will provide the University with &#8230; <a href="http://andersongreen.co.uk/articles/697/university-nottingham-energy-technology-building-etb/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£6.5m</p>
<p><strong>Client: </strong>University of Nottingham</p>
<h3>Synopsis</h3>
<p>The Energy Technologies Building is a £6.5m research centre which will bring together world-class experts in energy research at The University of Nottingham.</p>
<p>The 2500 m² facility will provide the University with a centre that is specifically designed for continuing and developing its world-leading energy research. It should also attract increased attention from industry, academia, funding agencies, researchers and students and stimulate public interest in new developments in sustainable energy.</p>
<p>The new building will comprise specialist laboratories, a prototype hall, an exhibition area, a rooftop laboratory zone, offices and external technology area for use as an energy testing facility.</p>
<h3>Best in Class</h3>
<p>It will be an exemplar of low-carbon technology through the minimisation of its demands for heating, cooling, lighting and ventilation mediums from non-sustainable sources, whilst maximising energy from renewable and ambient sources.</p>
<p>The sustainable design includes innovative earth duct passive cooling which uses the thermal mass of the surrounding earth to provide passive cooling and preheating of ventilation air.</p>
<p>The development is targeting a BREEAM ‘Outstanding’ accreditation for sustainability</p>
<p><a title="ETB Nottingham PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2012/02/ETB-Nottingham.pdf">Download PDF version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>A Fresh Start for Anderson Green</title>
		<link>http://andersongreen.co.uk/articles/367/fresh-start/</link>
		<comments>http://andersongreen.co.uk/articles/367/fresh-start/#comments</comments>
		<pubDate>Mon, 01 Aug 2011 14:05:17 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://dev.andersongreen.co.uk/?p=367</guid>
		<description><![CDATA[Celebrating our 10th year delivering forward thinking solutions for the built environment, we are taking this opportunity to re-brand and re-affirm our commitment to the environment, our clients and industry leading services. Our environment is changing it needs protecting To &#8230; <a href="http://andersongreen.co.uk/articles/367/fresh-start/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Celebrating our 10th year delivering forward thinking solutions for the built environment, we are taking this opportunity to re-brand and re-affirm our commitment to the environment, our clients and industry leading services.</p>
<h3>Our environment is changing it needs protecting</h3>
<p>To reduce our dependence on paper and ink we are making information that would have only been available in print available digitally, here on our brand new website.</p>
<p>As for the site itself, it is hosted on a <a title="Carbon Neutral Hosting" href="http://andersongreen.co.uk/go/ukfast/" target="_blank">Carbon Neutral</a> server and we have tried our upmost to make it easy to use wherever you are, even on the move via your mobile.</p>
<p>So as of today the 17th of August we are changing our brand identity and releasing this <a class="pdf" title="Mission Statement" href="http://andersongreen.co.uk/articles/367/fresh-start/mission-statement/" rel="attachment wp-att-373">Mission Statement</a> which we are proudly displaying on our front-page. It’s been a great 10 years and we would like to thank our clients, our staff and everyone who’s made it possible to get this far.</p>
<p>So please, enjoy the site and join us in helping to reduce our carbon output.</p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Begbroke Science Park</title>
		<link>http://andersongreen.co.uk/articles/317/begbroke-science-park/</link>
		<comments>http://andersongreen.co.uk/articles/317/begbroke-science-park/#comments</comments>
		<pubDate>Mon, 25 Jul 2011 15:13:00 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Education]]></category>

		<guid isPermaLink="false">http://dev.andersongreen.co.uk/?p=317</guid>
		<description><![CDATA[Details Value: £1.8M Client: Oxford University Anderson Green Duties: Cost certainty Value engineering Design / verification &#38; coordination of electrical and mechanical systems CFD (Computational Fluid Dynamics) analysis of the super computer room Synopsis The project consists of the new super computer &#8230; <a href="http://andersongreen.co.uk/articles/317/begbroke-science-park/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£1.8M</p>
<p><strong>Client: </strong>Oxford University</p>
<p><strong>Anderson Green Duties:<br />
</strong>Cost certainty<br />
Value engineering<br />
Design / verification &amp; coordination of electrical and mechanical systems<br />
CFD (Computational Fluid Dynamics) analysis of the super computer room</p>
<h3>Synopsis</h3>
<p>The project consists of the new super computer room and labs at Oxford University’s Begbroke Science Park.</p>
<p>The super computer facility consists of 56 no. server racks each generating 11kW of heat and a total heat gain of over 600kW.</p>
<h3>Best in class</h3>
<p>Because of the huge heat gain to a relatively small room and the maximum operating temperatures of the server racks, it was crucial that adequate cooling was received at the face of each rack.</p>
<p>A CFD (Computational Fluid Dynamics) simulation was preformed to calculate/predict that each rack will achieve adequate cooling.</p>
<p>The simulation highlighted the need for a number of minor amendments to the locations of the grilles, down-flow units and server racks.</p>
<p>Had this simulation not been performed, the cost to make such changes retrospectively would have been a very costly exercise.</p>
<p><a class="pdf" title="Begbroke Science Park PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2011/07/begbroke-science-park1.pdf">Download PDF version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Brierley Hill Health Centre</title>
		<link>http://andersongreen.co.uk/articles/311/brieley-hill-health-centre/</link>
		<comments>http://andersongreen.co.uk/articles/311/brieley-hill-health-centre/#comments</comments>
		<pubDate>Mon, 25 Jul 2011 14:55:01 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Healthcare]]></category>

		<guid isPermaLink="false">http://dev.andersongreen.co.uk/?p=311</guid>
		<description><![CDATA[Details Value: £3.6M (M&#38;E) Client: Dudley Health Authority Anderson Green Duties: Feasibility  costs Detailed tender costs Production of  fully coordinated /working drawings. Synopsis Throughout this new 11000m2 lift project Anderson Green provided services from project inception, successfully working with the contractor through &#8230; <a href="http://andersongreen.co.uk/articles/311/brieley-hill-health-centre/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£3.6M (M&amp;E)</p>
<p><strong>Client: </strong>Dudley Health Authority</p>
<p><strong>Anderson Green Duties:<br />
</strong>Feasibility  costs<br />
Detailed tender costs<br />
Production of  fully coordinated /working drawings.</p>
<h3>Synopsis</h3>
<p>Throughout this new 11000m<sup>2</sup> lift project Anderson Green provided services from project inception, successfully working with the contractor through a two stage design &amp; build procurement process demonstrating our in depth understanding and knowledge of the project and the building services required to meet the client’s requirements. We were then engaged to provide coordinated and working drawings.</p>
<p>Working closely with the construction team to build on time and within budget, services provided on this project included: Feasibility costs; Detailed services costings and indicative design carried out to provide cost certainty; Value engineering; Design or verification and coordination of mechanical and electrical systems; Production of Operating &amp; Maintenance manuals by Anderson Green.</p>
<h3>Best in class</h3>
<p>The construction team have praised Anderson Green in their commitment to this project and have stated that this is a model to follow on other lift projects.</p>
<p><a class="pdf" title="Brieley Hill Health Centre PDF" href="http://andersongreen.co.uk/cms/wp-content/uploads/2011/07/brierly-hill-health-centre.pdf">Download PDF version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>G Park Distribution Centre</title>
		<link>http://andersongreen.co.uk/articles/305/park-distribution-centre/</link>
		<comments>http://andersongreen.co.uk/articles/305/park-distribution-centre/#comments</comments>
		<pubDate>Mon, 25 Jul 2011 14:40:20 +0000</pubDate>
		<dc:creator>Anderson Green</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Industrial]]></category>

		<guid isPermaLink="false">http://dev.andersongreen.co.uk/?p=305</guid>
		<description><![CDATA[Details Value: £1.8M (M&#38;E) Client: Gazeley Anderson Green Duties: Feasibility costs Detailed tender costs M &#38; E  Design Production of fully coordinated /working drawings. Synopsis G Park Chatterly Valley, Gazeley’s Flag Ship logistics development, is a new distribution centre with office accommodation. &#8230; <a href="http://andersongreen.co.uk/articles/305/park-distribution-centre/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h3>Details</h3>
<p><strong>Value: </strong>£1.8M (M&amp;E)</p>
<p><strong>Client: </strong>Gazeley</p>
<p><strong>Anderson Green Duties:<br />
</strong>Feasibility costs<br />
Detailed tender costs<br />
M &amp; E  Design<br />
Production of fully coordinated /working drawings.</p>
<h3>Synopsis</h3>
<p>G Park Chatterly Valley, Gazeley’s Flag Ship logistics development, is a new distribution centre with office accommodation.</p>
<p>Working very closely with the construction team to build on time and within budget whilst meeting the strict sustainability criteria, Anderson Green supplied: Feasibility costs; Cost certainty; Value engineering; Design and coordination of mechanical &amp; electrical systems and Production of Operating &amp; Maintenance manuals.</p>
<p>Key parts of the project included: On site biomass micro power station; ETFE solar cell technology implanted into special roof-lights which eliminate night time light pollution yet let natural daylight into the warehouse during the day; PV Solar Panels; Solar Thermal Hot Water; Rain Water Harvesting; Advanced Building Monitoring System, including a display unit in the reception detailing building loads, energy production, quantity of energy exportation etc. Kinetic plates which capture energy every time a vehicle enters or leaves the site.</p>
<h3>Best in class</h3>
<p>The Greenest building of its type in Europe, and one of the greenest facilities in the world, G Park became the first development in the world to be awarded the new BREEAM (Building Research Establishment Environmental Assessment Method) “Outstanding” rating (design stage), the highest sustainable accolade available in property development.</p>
<p>The development employs a host of renewable sources which Anderson Green had to bring together to create the UK’s first truly carbon positive development.</p>
<p>G Park exceeds the UK Government’s Climate Change Bill targets for both 2020 and 2050 in 2009.  This not only delivers significant environmental savings, it also creates total energy and water cost in use savings of up to £300,000 per annum.</p>
<p><a class="pdf" title="G Park Distribution Centre PDF" href="http://dev.andersongreen.co.uk/cms/wp-content/uploads/2011/07/park-distribution-centre.pdf">Download PDF version</a></p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

Minified using disk: basic (Feed is rejected)
Page Caching using disk: enhanced
Database Caching 13/32 queries in 0.012 seconds using disk: basic

Served from: andersongreen.co.uk @ 2012-02-22 23:52:38 -->
