Anderson Green - building services consultants Home
London: 0207 831 6941
Nottingham: 0115 975 4141
Sheffield: 0114 243 5913
Leeds: 0113 243 2672
Brierley Hill Medical Centre

Brierley Hill Health Centre

West Midlands

Details

Value: £3.6M (M&E)

Client: Dudley Health Authority

Anderson Green Duties:
Feasibility  costs
Detailed tender costs
Production of  fully coordinated /working drawings.

Synopsis

Throughout this new 11000m2 lift project Anderson Green provided services from project inception, successfully working with the contractor through a two stage design & build procurement process demonstrating our in depth understanding and knowledge of the project and the building services required to meet the client’s requirements. We were then engaged to provide coordinated and working drawings.

Working closely with the construction team to build on time and within budget, services provided on this project included: Feasibility costs; Detailed services costings and indicative design carried out to provide cost certainty; Value engineering; Design or verification and coordination of mechanical and electrical systems; Production of Operating & Maintenance manuals by Anderson Green.

Best in class

The construction team have praised Anderson Green in their commitment to this project and have stated that this is a model to follow on other lift projects.

Home » Case Study » Brierley Hill Health Centre