Anderson Green - building services consultants Home
London: 0207 831 6941
Nottingham: 0115 975 4141
Sheffield: 0114 243 5913
Leeds: 0113 243 2672

Eastfield & Francis Askew Primary Schools

Value: £ 3 million (M&E)

Client: K Binks Heating Ltd

Anderson Green Role:

  • Design to RIBA Stage 3
  • Preparing detailed 3D coordination drawings
  • Schedules for M&E services
  • Provision of EPC / Part L Compliance calculations

Synopsis

Francis Askew and Eastfield Schools were built under the government’s priority school building programme. Both schools are a new-build 2-storey constructions located in Hull.

Anderson Green were involved with taking the design from RIBA Stage 3 and preparing the detailed 3D co-ordination drawings and schedules for all internal and external M&E services, including the provision of EPC / Part L compliance calculations.

The Mechanical installations comprised gas fired LTHW via radiators and radiant panels, hot water generation plant, mechanical ventilation via heat recovery and automatic controls.

Electrical works consisted of Small Power and Data installation throughout including AV systems. New Lighting, Fire Alarm, Security systems and containment systems throughout.

Francis Askew CGI

Best in Class

Hybrid ventilation units were utilised in conjunction with “Raft” style ceilings.

The thermal mass of the concrete soffit was utilised to provide night time free-cooling to minimise energy usage.

All classrooms incorporated full daylight dimming.

Home » Case Study » Eastfield & Francis Askew Primary Schools