Anderson Green - building services consultants Home
London: 0207 831 6941
Nottingham: 0115 975 4141
Sheffield: 0114 243 5913
Leeds: 0113 243 2672

Edgbaston Mill, Birmingham

Egham

Details

Value: £10 million

Client: Edgbaston Property Holdings Limited

Anderson Green’s Duties:

  • Feasibility Studies

Synopsis

Edgbaston Mill is a 200 bedroom Double Tree by Hilton hotel with adjacent three storey 3000m² health centre and spa and 180m² retail unit, all of which enjoys a prominent and highly visible location on the prestigious Calthorpe Estate, Edgbaston.

The building comprises of lower ground, ground floor and six storeys above ground.

The Hotel’s lower ground floor area will be utilised for car parking and plant areas, and the ground floor will contain three separately themed restaurants.

The first floor includes a 200 person function room, with the accommodation spread over the second to sixth floors of the building.

Best in Class

Reducing the typical high energy demand associated with hotels was a major consideration for the design of the building services.

The hotel lighting scheme predominately utilises LED luminaires closely controlled by a combination of time clock, daylight, proximity card and presence detection. High efficient air source heat pumps provide the bedrooms heating and cooling and the hot water is generated via a CHP unit which also serves the electrical services.

 

 

Home » Case Study » Edgbaston Mill, Birmingham