Anderson Green - building services consultants Home
London: 0207 831 6941
Nottingham: 0115 975 4141
Sheffield: 0114 243 5913
Leeds: 0113 243 2672

Hull ICC (Integrated Care Centre) – Hull

Construction Value: £8 Million

Client: Citycare Developments

Anderson Green Role:

  • Design of M&E Services to RIBA Stage 5
  • Provision of Part L compliance calculation
  • Statutory Authority Applications
  • BREEAM Assessment
  • BIM for 3D Co-ordination
  • Thermal Modelling Assessment
  • Energy Statement

Synopsis

As part of the Hull 2020 transformation programme, a new Integrated Care Centre combined with an operational fire station will be built on the existing former David Lister School site.

The two storey facility will reduce avoidable emergency hospital admissions and shorten the time spent in hospital for people who do need to be admitted. It will also address significant gaps in service, such as local access to assessment and diagnostic services.

The facility will allow for a natural integration with health and social care services in order to support more vulnerable people in the community.

The Integrated Care Centre will also help to deliver enhanced fire safety and prevention measures for people who are most at risk of fire within their own homes.

ICC Hull CGI

Hull ICC

Best in Class

Anderson Green are responsible for the complete design of all mechanical and electrical services as well as achieving a BREEAM ‘Excellent‘ rating for the building via incorporation of various sustainable technologies and passive design features, including an air source heat pump system, photovoltaics, solar shading, natural daylight and natural ventilation.

Hull ICC

To download the PDF click here Hull ICC

Home » Case Study » Hull ICC (Integrated Care Centre) – Hull