Nottingham Train Station

Nottingham

Details

Birmingham New Street Station Train Operators Accommodation Building.

Value: £1million

Client: Imtech G&H (Nottm)

Anderson Green’s Duties:

  • Site Survey of Existing Installation.
  • Full Detailed Tender Costs
  • Production of fully coordinated /working drawings

Synopsis

Refurbishment of a standalone existing and extended two storey building with basement including offices, interview rooms, kitchen and boiler house including the upgrade of two Pumpkin cafés on the train station platforms.

The project comprised of boiler plant replacement, new air handling units and comfort cooling to the Interview Rooms.

New energy efficient lighting with automatic controls was designed and installed to minimise energy consumption.

Fire alarm and communications systems were designed and installed which were integrated into the main train station.

Best in Class

The Building provided a working environment in line with the latest standards and building regulations.

The building also allowed improved access to the train station via a new interconnecting concourse.