Anderson Green - building services consultants Home
London: 0207 831 6941
Nottingham: 0115 975 4141
Sheffield: 0114 243 5913
Leeds: 0113 243 2672

South Park Hub, London

Value: £16,000 (M&E)

Client: Swiftline Engineering Limited

Anderson Green Role:

  • BIM Level 2
  • Full M&E Design
  • Co-ordinated working drawings
  • Part L & EPC production
  • Thermal modelling

Synopsis

A new multifunction building located at the Olympic village adjacent to the ArcelorMittal Orbit sculpture.

Anderson Green provided the full MEP design, coordinated working drawings and BIM modelling of all MEP services throughout the building.

South Park Hub, London

Best in Class

This was Anderson Green’s first BIM Level 2 Project.

Various BIM platforms were used by the design team, however we were still able to collaborate effectively using IFC and produce clash-free detailed coordinated models and drawings ensuring the BIM strategy for the project was realised.

Non graphical data and asset tagging was provided to all MEP systems and equipment in line with the project BIM Execution Plan and clients’ requirements.

To download the PDF click South Park Hub, London

Home » Case Study » South Park Hub, London